CONSTRUCTION OF 300M DOUBLE LINE RCC BRIDGE AND APPROACH ROAD ON HELMAND RIVER, AT SARESHILA AREA, ZARANJ-KANG ROAD, NIMROZ PROVINCE.

Contract No.

MPW/GOV/NRAP/SOUTH/NRZ/471/C2/001

Client/Owner

Ministry of Public Works (MPW) – Afghanistan

Role of TechnicalBuilders

Prime Contractor

Status

Completed in 2024

SCOPE OF WORK

• Earthwork (Excavation for foundation and trenching).
• Compacted Backfilling of material (soil and aggregates),
• Cast-in-situ Piling,
• Concrete work (PCC, RCC & Mass concrete).
• Installation of bearing pads and Bridge expansion joints,
• Static Load Test on piles,
• Road embankment, Sub grade, Sub-base, Base coarse work.
• Bituminous Prime/Tack coat, AC binder base & wearing coarse.
• River diversion and Dewatering,
• Shop drawing and As-built survey/drawing.
• Project/Contract Management.