Highway 1 bridge SBK-1001

Construction of Highway 1 Bridge SBK-1001 Zabul province - Afghanistan

Scope of work

This project consists of Site improvement, Design and Construction of Bridge SBK-1001, demolition of existing structures, bridge replacement, construction of a single lane Bypass reinforced concrete surfaced road with a multi-cell box-culvert, complete channel upgrades with stone pitching, etc. It has been designed with the latest edition of the AASHTO LRFD Bridge Design Specifications, for class 70 Tons heavy truck traffic and military vehicle loading and designed to withstand the wind and seismic loads as per requirement

Project Details

Contract No

W5J9LE-11-C-0055

Client

USACE-S

Prime Contractor

TechnicalBuilders

Status

Completed on 28-Nov-2012

Project Gallery

technicalBuilders

Add: Shahre-naw kabul afghanistan

phone: +93 (0) 700 158 258

Email: technical@builders.af

usefull links

our services

Bridges constraction

road ways

Buildings constraction

irragation systems

Pipeline constraction