Construction of 300m double line RCC Bridge and Asphaltic approach road on Helmand river, in Sar-e-Shela village, Zaranj-Kang road, Nimroz province

Scope of work

Major activities include but not limited to Pile foundations, Earthwork, RCC (25Mpa and 30Mpa) work, PCC (15Mpa) work, Railing, Traffic signs, Embankment of road, Sub-base of road, Base coarse, Asphalt binder coarse and wearing coarse, Road marking, Drainage system, Utility works, Etc.

Project Details

Contract No

MPW/GOV/NRAP/SOUTH/NRZ/471/C2/001

Client

MOPW

Prime Contractor

TechnicalBuilders

Status

Ongoing (60% completed)

Project Gallery

Construction of Shina Bridge and Approach road in Kabul city

Scope of work

Major activities include but not limited to: Pile foundations, Earthwork, RCC (30Mpa) work, PCC (16Mpa) work, Prestressed Concrete (40Mpa) work, Curbstone work, Barrier, Interlocking, Railing, Roadway solar lights, Embankment of road, Sub-base of road, Base coarse, Asphalt wearing of Bridge, Asphalt work of road, Road marking, Drainage system, Utility works, etc..

Project Details

Contract No

NPA/KM/97/W-2121/NCB

Client

Kabul Municipality

Prime Contractor

TechnicalBuilders

Status

Completed on Sep-2020

Project Gallery

Construction of Pacha Bridge Kabul province

Scope of work

Major activities include but not limited to: Pile foundations, Earthwork, RCC (30Mpa) work, PCC (16Mpa) work, Prestressed Concrete (40Mpa) work, Curbstone work, Barrier, Interlocking, Railing, Roadway solar lights, Embankment of road, Sub-base of road, Base coarse, Asphalt wearing of Bridge, Asphalt work of road, Road marking, Drainage system, Utility works, etc..

Project Details

Contract No

NPA/KM/97/W-2120/NCB

Client

Kabul Municipality

Prime Contractor

TechnicalBuilders

Status

Completed on Sep-2020

Project Gallery

Construction of Juvenile & Rehab Center in Badakhshan province

Scope of work

Main activities included but not limited to Earthwork, PCC, RCC, Bricks work, Plaster, Tile and Ceramic work, Electrical and Mechanical works, Drainage system, Fire Alarm system, Painting, HVAC, Utilities, etc..

Project Details

Contract No

AFG/MOJ/1396/NCB/001

Client

Ministry of Justice (MOJ)

Prime Contractor

TechnicalBuilders

Status

Completed on 30/Dec/2019

Project Gallery

200m Double Line RCC Bridge and 0.62 Km Approach roads in Center of Takhar province

Scope of work

Main Activities included but not limited to Earthworks, Formworks, Pile boring/casting, Stone masonry work, Dry stone pitching, PCC (15 Mpa), RCC (25Mpa, 30Mpa), Railing, etc.

Project Details

Contract No

RRD/MOF/ NRAP/NRHE/TKR/048/C2/001

Client

MRRD - Afghanistan

Prime Contractor

TechnicalBuilders

Status

Completed on 31/Dec/2018

Project Gallery

Shahr-e-Naw Irrigation Scheme in Badakhshan province

Scope of work

Rehabilitation of about 14 KM irrigation canal, includes Intake structures, Stone masonry protection walls, Upgrading of canal walls, River side protections by PCC, Railing works, Wash structures, Off-take structure, Culvert Structure, Spillway structures, Syphon structure, MS Pipeline 2.5 KM, Gabion work, Widening of existing canal site, Road Culvert structures, Division box structure, Footpath culvert, Canal lining by RCC, etc.

Project Details

Contract No

U-512

Client

Ministry of Energy & Water (MEW)

Prime Contractor

TechnicalBuilders

Status

Completed on (29-12-2017)

Project Gallery

110m Kozar Prestressed Concrete Bridge (Dara-e-Rast and Toghak) in Yaftal-e-Sufla district of Badakhshan

Scope of work

Construction of 110m long (3 spans) prestressed girder bridge, Approach road, Stone masonry retaining walls, Rip-rap protections, Pile works, Post tensioning of girders, Launching of girders, etc

Project Details

Contract No

RRD/WB/ARAP/BKN/BKN/090/C2/001

Client

MRRD - Afghanistan

Prime Contractor

TechnicalBuilders

Status

Completed 16/May/2016

Project Gallery

AIF Saracha Bridge, Behsud district, Nangarhar province - Afghanistan

Scope of work

The cope of this project includes the design and all necessary construction capabilities to demolish existing destroyed stone bridge, construction of a 160 m prestressed girder bridge with approach road at the Saracha crossing point in Nangarhar Province. This Bridge/Road is designed by TBC engineers, capable of handling heavy truck traffic and non-tracked military vehicles, it is designed with the 2012 edition of the AASHTO LRFD Bridge Design Specifications, for class 70 Tons heavy truck traffic and military vehicle loading and designed to withstand the wind and seismic loads. The bridge has 7.10-meter concrete way for the vehicle traffic and 1.5 meter walkways on both sides. Asphalt surface Roads 1Km and bridges have two separate lanes of traffic

Project Details

Contract No

W912DW-13-C-0018

Client

USACE-M

Prime Contractor

TechnicalBuilders

Status

100% completed on 27/Dec/2015

Project Gallery

Projects gallery

TeBu

Mabey Johnson Bridge

Behsud district, Nangarhar province - Afghanistan

Al-Bawardi Masjid Complex Building

Khost province, Afghanistan

Highway 1 Bridge SBK-1001

Khost province, Afghanistan

Highway 1 Bridge SBZ-1011

Zabul province - Afghanistan

New Qarghayi Bridge and Approached road

Laghman province - Afghanistan

ANP Assessment Survey of UP District
HQs

Kabul province, Afghanistan

Afghan National Border Police
Headquarters

Site adapt design and Construction

4 Barracks Buildings at North Site of Cantonment Area

Kabul International Airport, Afghanistan

Vehicle Maintenance Facility

NIU camp, Kabul, Afghanistan

New Connex Office addition in Geodesy House

Geodesy & Cartographic Institute, Kabul, Afghanistan

Custom Facilities Sher Khan Bandar Phase II

Kundoz province - Afghanistan

technicalBuilders

Add: Shahre-naw kabul afghanistan

phone: +93 (0) 700 158 258

Email: technical@builders.af

usefull links

our services

Bridges constraction

road ways

Buildings constraction

irragation systems

Pipeline constraction